Analytics Tracking
 
 
 Streambanks

 

Featured Project

Project: Lemhi River Channel Construction
Location: Leador, ID
Client: Idaho Fish and Game
Date: 08/2011

 

 
Challenge:
To construct a new channel on a portion of the Lemhi River to bypass and unproductive reach.

 

Solution:
Wetland Sod was used to mitigate erosion on the newly constructed channel and rapidly establish a functional sedge community.

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN