Analytics Tracking
 
 
 Streambanks

 

Featured Project

Project: Lakewood Gulch Bank Stabilization
Location: Denver, CO
Client: City of Denver
Date: 05/2012

 

 
Challenge:
Highly erosive soils resulted in a destabilized bank with little vegetation.

 

Solution:
Prevegetated coir logs were used for bank toe stabilization and to establish vegetation

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN