Analytics Tracking
 
 
 Streambanks

 

Featured Project

Project: Parker Jordan Open Space Cherry Creek Reclamation
Location: Centennial, CO
Client: City of Centennial
Date: 05/2012

 

 
Challenge:
Highly erosive soils resulted in destabilized banks with little vegetation.

 

Solution:
Wetland Sod was used to stablize the bank and rapidly establish a vegetated edge.

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN