Analytics Tracking
 
 
 Streambanks

 

Featured Project

Project: Indian Creek
Location: Caldwell, ID
Client: CH2M Hill
Date: 09/2006

 

 
Challenge:
Provide stream bank stabilization, erosion control and immediate aesthetic to highly visible, newly constructed urban walkway

 

Solution:
Wetland Sod was installed in various sensitive areas to achieve project success.

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN