Analytics Tracking
 
 
 Streambanks

 

Featured Project

Project: Kirk
Location: Driggs, ID
Client: Intermountain Aquatics
Date: 07/2014

 

 
Challenge:
High spring flows damaged an earthen dam.

 

Solution:
Wetland sod was installed ensuring that there would plenty of vegetative cover and erosion stabilizing root structure developed by the return of high flows the next spring.

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN