Analytics Tracking
 
 
 Streambanks

 

Featured Project

Project: Monsanto Streambanks
Location: Soda Springs, ID
Client: Intermountain Aquatics
Date: 07/2013

 

 
Challenge:
5,500 linear feet of eroding streambank on the Blackfoot River in eastern Idaho.

 

Solution:
Wetland Sod was used to stabilize the 19 eroding banks / 5,500 linear feet of eroding streambank. Project continues into 2014.

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN