Analytics Tracking
 
 
 Stormwater

 

Featured Project

Project: Update to Westerly Creek 3 (one year later)
Location: Denver, CO
Client: Denver Urban Drainage
Date: 05/2016

 

 
Challenge:
Extensive restoration to bring a creek back to it's natural condition was necessary following construction re-exposure of the previously buried channel in an urban area.

 

Solution:
The images show updates one year after over 270 Wetland Sod Mats and over 2,000 plugs were installed.

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN