Stormwater |
Featured Project |
|
||
Project: Piney Creek Reach 6
|
|||
Challenge: A section of Piney Creek was deeply eroded and in need of repair/restoration to restore the natural corridor. |
![]()
|
||
Solution: Over 550 Wetland Sod Mats were utilized to revegetate the stream. Two different mixtures of species were used (a sedge mix and a monoculture mix) to best meet the requirements of both the wetter and drier restoration areas of the wetland. |
|||
|
|||
|
|||
|