Analytics Tracking
 
 
 Wetland Mitigation

 

Featured Project

Project: Pioneer Mountain-Eddyville mitigation site A
Location: Eddyville, OR
Client: Oregon Dept. of Transportation
Date: 09/2016

 

 
Challenge:
Mitigation mandated by recent construction called for Wetland Restoration in this area: Brush Trail road, off of US20 at milepoint 25.5.

 

Solution:
North Fork Native Plants custom grew over 69,000 plugs to produce over 500 Wetland Sod Mats for installation in this area to cover over 30,150 square feet. Overage from 5.5 plugs were retained by ODOT for no additional charge, and also planted, as evidenced on the second image down.

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN