Golf Courses

 

Featured Project

Client: City-County of Butte-Silver Bow, MT
Location: Butte, MT
Project: Stormwater Detention Basin
Date: 09/2018

 

 
Challenge:
Stodden Park was overhauled and the new site design required controlling more stormwater and irrigation runoff and snow melt.

 

Solution:
Designers incorporated a stormwater detention basin into park and lined the high-water, design storm level with Wetland Sod to soften and naturalize the park aesthetic with native plants.

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN