Analytics Tracking
 
 
 Bare Root Wetland Plants

 

Featured Project

Client: Botanical Developments
Location: Redmond, OR
Project: Shumway Lake
Date: 01/2005

 

 
Challenge:
Lack of significant vegetation around the lakeside was creating an erosion control problem.

 

Solution:
62 Wetland Sod Mats and 6000 Wetland Plugs were used to create immediate stabilization and revegetation. The after images shown were taken in August of 2015, 3 months after installation

 

 

 

 

 

 

 

  SITE DEVELOPMENT: AH Digital FX Studios
SITE DESIGN: LINDA GRIMM DESIGN